Department of Veterans Affairs, Sarasota National Cemetery, Sarasota, FL
Client: Department of Veterans Affairs
Year: 2021
Location: Sarasota, Florida
Features:
Successfully delivered the project early and on budget.
Applied stringent geotechnical engineering parameters.
Utilized hand-drilling techniques in the upper five feet of soils.
Demonstrated flexibility and mobility for nationally-based clients.
Streamlined operations to maintain cost efficiency.
Project Summary
The Department of Veterans Affairs, Sarasota National Cemetery expansion project required a comprehensive geotechnical investigation to support planned site improvements. Central Engineering Services (CES) leveraged its extensive national experience and adaptability to meet the unique challenges posed by the local climate and geotechnical conditions. Operating within a constrained budget and timeline, CES coordinated with local drilling subcontractors and consulting partners to successfully complete the project ahead of schedule and within budget. This project highlights CES's ability to provide cost-effective, practical geotechnical solutions while maintaining stringent engineering standards and compliance with local regulations.
Scope of Work:
CES conducted an extensive geotechnical investigation of the soils surrounding the expansion areas of Sarasota National Cemetery. The project required careful planning and execution, balancing the complexity of working in a different climate and geological setting with the need for practical and competitive solutions. Collaborating with local drillers and consulting partners, CES ensured compliance with all local jurisdictional requirements, including Florida's Department of Transportation and Department of Environmental Protection regulations. The project was managed efficiently from CES's Portland-based office, demonstrating the firm's ability to provide nationwide support with seamless coordination.
Feature:
Engaged with local subcontractors to optimize logistics and ensure regulatory compliance.
Conducted hand-drilling in the upper five feet to comply with site-specific legal requirements.
Implemented a customized project management system to enhance workflow and cost efficiency.
Maintained clear and responsive communication with all stakeholders to facilitate smooth project execution.
Delivered comprehensive geotechnical reports that informed the client's design and construction planning.
Results:
CES successfully navigated the regulatory landscape and site-specific challenges, delivering a high-quality geotechnical investigation that met all project requirements. By adhering to local guidelines and performing the necessary hand-drilling techniques, the firm ensured compliance with environmental and safety standards. The project was completed ahead of schedule and within budget, showcasing CES's proactive approach to communication, research, and subcontractor management. The use of a tailored project management system further contributed to the project's success, optimizing efficiency and cost-effectiveness for all parties involved.